Kanban just-in-time at Toyota (Record no. 1589)

MARC details
000 -LEADER
fixed length control field 01907nam a22002057a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220323153228.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 220314b ||||| |||| 00| 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780915299485
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.56
Item number JAP
245 ## - TITLE STATEMENT
Title Kanban just-in-time at Toyota
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Name of publisher, distributor, etc. CRC Press
Place of publication, distribution, etc. New York
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xix, 192 p.
365 ## - TRADE PRICE
Price type code INR
Price amount 1195.00
520 ## - SUMMARY, ETC.
Summary, etc. Toyota's world-renowned success proves that just-in-time (JIT) makes other manufacturing practices obsolete. This simple but powerful book is based on the seminars given by Taiichi Ohno and other senior production staff to introduce Toyota's own supplier companies to JIT. It teaches the philosophy and implementation of what many call the most efficient production system in the world.<br/>Provides a clear structure for an introductory JIT training program.Explains every aspect of the JIT system, including how to set it up and how to refine it once it's in place.Shows how to use a simple visual system to control the production process.<br/>Every day more American companies are learning that JIT works outside Japan. Now you can get started with this step-by-step book which guides you through the implementation process. Every engineer, manager, supervisor, and worker should read this book to get the clearest, simplest, and most complete introduction to JIT available in English.<br/><br/>Results at American companies after reading this book:<br/><br/>Lead-time on one product was reduced from 12 weeks to 4 days.Setup time on a large blanking press was reduced from eight hours to one minute and four seconds.Work-in-process has been reduced 50 percent plant-wide.Factory floor space was opened up 30 to 40 percent in every on of their plants.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Production control
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Just-in-time systems
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Japan Management Association
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Lu, David John, 1928- [Translator]
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Book
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Home library Current library Shelving location Date acquired Source of acquisition Cost, normal purchase price Total Checkouts Full call number Accession Number Date last seen Copy number Cost, replacement price Price effective from Koha item type Bill No Bill Date
    Dewey Decimal Classification     Human Resource and Organization Behvaiour Indian Institute of Management LRC Indian Institute of Management LRC General Stacks 03/14/2022 Bharatiya Sahitya Bhavana 836.50   658.56 JAP 002126 03/14/2022 1 1195.00 03/14/2022 Book IN505 04-03-2022

©2019-2020 Learning Resource Centre, Indian Institute of Management Bodhgaya

Powered by Koha