Master planning and scheduling: an essential guide to competitive manufacturing (Record no. 2828)

MARC details
000 -LEADER
fixed length control field 14535nam a22002297a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220723131452.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 220706b ||||| |||| 00| 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119809418
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.53
Item number PRO
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Proud, John F.
245 ## - TITLE STATEMENT
Title Master planning and scheduling: an essential guide to competitive manufacturing
250 ## - EDITION STATEMENT
Edition statement 4th
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Name of publisher, distributor, etc. John Wiley & Sons, Inc.
Place of publication, distribution, etc. New Jersey
Date of publication, distribution, etc. 2022
300 ## - PHYSICAL DESCRIPTION
Extent xlii, 917 p.
365 ## - TRADE PRICE
Price type code USD
Price amount 149.95
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note TABLE OF CONTENTS<br/> Acknowledgments xxiii<br/><br/>Foreword xxix<br/><br/>Introduction xxxi<br/><br/>Initial Thoughts xxxix<br/><br/>1 Chaos in Manufacturing 1<br/><br/>Problems in Manufacturing 2<br/><br/>And the Solutions 7<br/><br/>Getting Out of the Overloaded Master Plan and/or Master Schedule 16<br/><br/>Rescheduling the Overloaded Master Plan and/or Master Schedule 19<br/><br/>2 Why Master Planning and Scheduling 25<br/><br/>The Four Cornerstones of a Manufacturing Business 25<br/><br/>Between Strategy and Execution 27<br/><br/>What Is a Master Plan versus a Master Schedule? 31<br/><br/>Maximizing, Minimizing, and Optimizing 32<br/><br/>Objectives of Master Planning and Scheduling (If You Don’t Know Where You’re Going, Any Road Will Get You There) 33<br/><br/>Challenges for the Master Planner and Master Scheduler 35<br/><br/>Principles of Master Planning and Scheduling 37<br/><br/>MPS, MRPII, ERP, SCM, and ITP 39<br/><br/>Finding the Diamond in the Rough—Why It’s Important 58<br/><br/>The Four Cornerstones of Manufacturing Revisited 67<br/><br/>Four Levels of Planning (Sometimes Use Only Three) 68<br/><br/>Why Master Planning and Scheduling Is a Must in Business Excellence 74<br/><br/>3 The Mechanics of Master Planning and Scheduling 79<br/><br/>The Importance of Master Planning and Scheduling 79<br/><br/>The Master Planning and Scheduling Matrices 80<br/><br/>Master Scheduling in Action 87<br/><br/>Why and How Master Scheduling Drives Material Requirements Planning and Detailed Scheduling 92<br/><br/>The What, Why, and How of Safety Stock 99<br/><br/>Additional Material Planning Techniques 103<br/><br/>Maintaining Demand/Supply Balance Inside the Planning Time Fence 107<br/><br/>Master Plan and Schedule Design Criteria 113<br/><br/>So, What’s Next? 115<br/><br/>4 Managing the Supply Chain with Master Planning and Scheduling 117<br/><br/>The Master Planner’s and Master Scheduler’s Job 119<br/><br/>Exception-Driven Action Messages 125<br/><br/>Six (Sometimes Seven) Key Questions to Answer 129<br/><br/>Answering the Six (or Seven) Questions 133<br/><br/>Time Zones as Aids to Decision Making 134<br/><br/>Planning Within Master Planning and Scheduling Policy 138<br/><br/>No Past Dues 141<br/><br/>Managing with Planning Time Fences 142<br/><br/>Load-Leveling in Manufacturing 147<br/><br/>Lean Manufacturing and Continuous Improvement 150<br/><br/>Mixed-Model Scheduling 151<br/><br/>Planned Plant Shutdowns 154<br/><br/>5 Using the MPS Output for Make-to-Stock Products 159<br/><br/>The Master Schedule Screens 160<br/><br/>Working Make-to-Stock Master Scheduled Items 168<br/><br/>Time Phasing the Bills-of-Material 170<br/><br/>Understanding Exception-Driven Action Messages 172<br/><br/>Bridging Data and Judgment 180<br/><br/>The Seven Key Questions Revisited 184<br/><br/>Scheduling in a World of Many Schedules 185<br/><br/>From Master Planning and Scheduling to Time-Phased Material Requirements Planning 194<br/><br/>From Master Planning to Master Scheduling (It’s Called Master Planning and Scheduling) 199<br/><br/>6 Where and What to Master Plan and Master Schedule 203<br/><br/>Manufacturing Strategies Defined 204<br/><br/>Choosing the Right Manufacturing Strategy 206<br/><br/>Master Planning, Master Scheduling, and Product Structures 210<br/><br/>Multilevel Master Planning and Scheduling 213<br/><br/>Ensuring That Supply Plans and Schedules Are Aligned, Synchronized, and Integrated 216<br/><br/>Master Scheduling Capacities, Activities, and Events 224<br/><br/>7 Scheduling in a Flow Environment 227<br/><br/>Different Manufacturing Environments 228<br/><br/>Similarities Between Intermittent and Flow Environments 232<br/><br/>Product Definition 236<br/><br/>The Planning Process 239<br/><br/>Process Company Using Rough Cut Capacity Planning: An Extended Example 244<br/><br/>Catalysts and Recovered Material 250<br/><br/>Production Line Scheduling 251<br/><br/>Planning Multiplant Workloads 252<br/><br/>8 Planning Bills 255<br/><br/>The Overly Complex Bill-of-Material 257<br/><br/>Anatomy of a Planning Bill 266<br/><br/>Creating Demand at the Master Planning and Scheduling Level 271<br/><br/>9 Two-Level MPS Coupled with Other Advanced Techniques 277<br/><br/>The Backlog Curve 277<br/><br/>Identifying Demand 281<br/><br/>Creating the Master Plan and/or Master Schedule for Products Using a Make-to-Order Manufacturing Strategy 288<br/><br/>Option Overplanning 292<br/><br/>Calculating Projected Available Balance for Pseudo Items 294<br/><br/>Calculating Available-to-Promise 295<br/><br/>Using Available-to-Promise to Commit Customer Orders 297<br/><br/>Changes in Projected Available Balance 303<br/><br/>Option Overplanning for Products in the Make-to-Stock Environment 305<br/><br/>Master Planning and Scheduling Products in Make-to-Stock and Make-to-Order Environments: A Comparison 309<br/><br/>10 Using MPS Output for Make-to-Order Products 313<br/><br/>Using Planning Bills to Simplify Option Scheduling 315<br/><br/>The Scheduling Process 317<br/><br/>Master Scheduling Common Components 321<br/><br/>Analyzing the Detail Data 325<br/><br/>Balancing the Sold-Out Zone for Common Components 326<br/><br/>Handling Abnormal Demand 328<br/><br/>Action Messages 330<br/><br/>Working the Pseudo Options 330<br/><br/>Master Scheduling Purchased Items in the Planning Bill 341<br/><br/>Linking the Master Plan to the Master Schedule to the Material Plan 346<br/><br/>Manufacturing Strategies—Products in the Make-to-Order Environment 350<br/><br/>11 Master Planning and Scheduling in Custom-Product Environments 355<br/><br/>The Unique Challenges of the DTO and ETO Environments 356<br/><br/>The Case of New Product Introduction 358<br/><br/>Master Planning and Scheduling—Activities and Events 363<br/><br/>Prices and Promises to Keep 367<br/><br/>What Can Go Wrong 368<br/><br/>Integrating Design and Operation Activities 370<br/><br/>Plan Down, Replan Up 373<br/><br/>Make-to-Contract Environments 381<br/><br/>The Need for Standards—A Long Time Ago 382<br/><br/>When Supply Can’t Satisfy Demand 386<br/><br/>12 Finishing or Final Assembly Scheduling 389<br/><br/>Manufacturing Strategy Tied to Finishing/Final Assembly Schedules 389<br/><br/>Manufacturing Strategy Approaches 391<br/><br/>Traditional Means of Communicating the Master Plan and/or Master Schedule 395<br/><br/>The Role of People and Computers in Finishing and Final Assembly Scheduling—Past, Present, and Future 397<br/><br/>The Kanban System 399<br/><br/>Tying It All Together (Aggregate Integrated Business Planning Through Master Planning and Scheduling Through Detailed Production Scheduling) 403<br/><br/>Final Assembly or Process Routings 406<br/><br/>Configuring and Building to a Customer Order 408<br/><br/>Finishing or Final Assembly Combined Materials and Operations List 411<br/><br/>Choosing the Most Effective Approach 413<br/><br/>Master Plans versus Master Schedules versus Finishing Schedules 414<br/><br/>Master Scheduling Logistics (Sharing In/Out Information) 415<br/><br/>13 Data Integrity Requirements to Support Master Planning and Scheduling 417<br/><br/>What Is Data Integrity and Why Is It Important? 418<br/><br/>Gaining Control and Integration Points 422<br/><br/>The Four Pillars of Data Integrity 425<br/><br/>Applying the Four Pillars of Data Integrity in Support of Master Planning and Scheduling 438<br/><br/>Summary 452<br/><br/>14 Integrated Business Planning 455<br/><br/>Integrated Business Planning Process Elements in Brief 457<br/><br/>Workable, Adjustable Plans 466<br/><br/>Master Supply Planning 468<br/><br/>Integrated Business Planning and the Master Supply Schedule 470<br/><br/>Synchronizing and Assessing Demand and Supply 481<br/><br/>Measuring Accuracy and Performance 487<br/><br/>The Evolution of Integrated Business Planning 495<br/><br/>15 Resource Requirements Planning and Rough Cut Capacity Planning 499<br/><br/>Know Before You Go 500<br/><br/>Rough Cut Revealed 502<br/><br/>The Rough Cut Process 502<br/><br/>Creating the Resource Profile 505<br/><br/>Finalizing the Resource Profile 512<br/><br/>Capacity Inputs 514<br/><br/>Overloading Demonstrated and/or Planned Capacity 520<br/><br/>Rough Cut Capacity Planning at the Master Planning and Master Scheduling Levels 522<br/><br/>Resource Requirements and Rough Cut Capacity Planning Graphs 529<br/><br/>Using and Working the Rough Cut Capacity Plan 533<br/><br/>Simulations—Rough Cut Capacity Planning 538<br/><br/>Screen and Report Formats 540<br/><br/>Rough Cut Capacity Planning at a Process Company (Industry Example) 543<br/><br/>The Benefits and Limitations of Rough Cut Capacity Planning 551<br/><br/>Implementing the Rough Cut Capacity Planning Process 554<br/><br/>Closing Comments Regarding Resource Requirements Planning and Rough Cut Capacity Planning 555<br/><br/>16 Supply Management and Aggregate Master Planning 559<br/><br/>Supply Management and Master Planning in Action 565<br/><br/>The Impact of New Product in Supply Management and Master Planning 567<br/><br/>Inventory Projection and Planning 572<br/><br/>Will the Plan Work? 575<br/><br/>Product-Driven, Disaggregated Inventory Planning 577<br/><br/>Product-Driven, Aggregated Backlog Planning 579<br/><br/>Product-Driven, Disaggregated Backlog Planning 585<br/><br/>Production-Driven Environments 589<br/><br/>Reviewing and Approving the Aggregate Supply Plan 591<br/><br/>Interplant Product Integration 592<br/><br/>Key Performance Metrics—Calculations, Colors, Standards 597<br/><br/>Should Companies Have Supply Managers and/or Master Planners? 598<br/><br/>17 Demand Management and Aggregate Master Planning 603<br/><br/>What Is Demand Management? 603<br/><br/>The Impact of New Product in Demand Management 608<br/><br/>Master Launch Plan and Pipeline Funnel Examples for New Products 609<br/><br/>Problems with the Demand Forecast 614<br/><br/>The Impact of Demand Bias on Supply Chain Management 615<br/><br/>Coping with Forecast Inaccuracies 617<br/><br/>Reviewing and Approving the Aggregate Demand Plan 619<br/><br/>It’s About Quantities 621<br/><br/>It’s About Time 623<br/><br/>Demand and Forecast Adjustment 631<br/><br/>Customer Order Processing with Process Flow Diagram Example 637<br/><br/>Possible Problems Caused by Abnormal Demand 640<br/><br/>Customer Linking 642<br/><br/>Getting Sales Pipeline Control 645<br/><br/>Distribution Resource/Requirements Planning 646<br/><br/>Available-to-Promise 655<br/><br/>ATP with Two Demand Streams 659<br/><br/>Should Companies Have Demand Managers? 663<br/><br/>18 The Proven Path to a Successful MPS Implementation (Phase 1) 669<br/><br/>From the Original Implementation Plan to the Current Proven Path 669<br/><br/>The Proven Path to Successful Operational Excellence 671<br/><br/>The Decision Point 673<br/><br/>Going on the Air 675<br/><br/>The Former Proven Path to Master Planning and Scheduling in a Class A Operational Excellence Environment 676<br/><br/>The Journey to Excellence—Today and Tomorrow 679<br/><br/>Oliver Wight’s Class A Integrated Planning and Control Milestone 681<br/><br/>The Proven Path (3rd Version) to Successful Supply Chain Management and Master Planning and Scheduling Implementation 683<br/><br/>Phase 1: Lead Phase (Understanding and Committing) 685<br/><br/>Company Vision of Operations (A Modified Client Example) 687<br/><br/>Case for Change (A Modified Excerpt from a Client Example) 696<br/><br/>Segue to . . . 702<br/><br/>The Proven Path to a Successful MPS Implementation (Phase 2) Influencers Transform MPS Process Design and Structure 702<br/><br/>19 The Proven Path to a Successful MPS Implementation (Phase 2) 705<br/><br/>Methodology for Implementing Change Revisited 705<br/><br/>Phase 2: Transform Phase (Process Designing and Structuring) 707<br/><br/>Policy, Flow Diagrams, Procedures, Work Instructions, and Metrics Defined 731<br/><br/>Segue to . . . 741<br/><br/>The Proven Path to a Successful MPS Implementation (Phase 3) Users Own MPS Launch and Measures 741<br/><br/>20 The Proven Path to a Successful MPS Implementation (Phase 3) 743<br/><br/>Methodology for Implementing Change Revisited—Again! 743<br/><br/>Phase 3: Own Phase (Launching and Measuring) 745<br/><br/>Deterrents to Successful Implementation of the Master Planning and Scheduling Process and Supporting System Technology 762<br/><br/>The Master Planner’s and Master Scheduler’s List of Responsibilities 764<br/><br/>Putting It All Together to Ensure Success—Guaranteed 768<br/><br/>An Aggressive Master Plan and Schedule for the MPS Implementation 771<br/><br/>The Variables of a Master Planning and Scheduling Implementation 774<br/><br/>Epilogue<br/><br/>Order from Chaos 779<br/><br/>Final Thoughts – People and Process and Profession 783<br/><br/>Appendix A Master Planning and Scheduling Process and Performance Standards 809<br/><br/>Appendix B Master Planning and Scheduling Improvement Initiative Task Listing 817<br/><br/>Appendix C Master Planning and Scheduling Policy, Procedure, and Flow Diagram 827<br/><br/>Appendix D Master Planning and Scheduling 831<br/><br/>Appendix E Supply Chain Management Overall Process Flow Diagram (An Example) 843<br/><br/>Appendix F Master Planning and Scheduling Process Flow Diagram Examples 845<br/><br/>Appendix G Master Planning and Scheduling RACI Examples 851<br/><br/>Appendix H Master Planning and Scheduling Spinoff Task Team Charter 855<br/><br/>Appendix I Master Planning and Scheduling Oliver Wight International Offerings Founders’ and Co-Authors’ Biographies 859<br/><br/>Glossary 865<br/><br/>Index 895
520 ## - SUMMARY, ETC.
Summary, etc. The newly revised Fourth Edition of Master Planning and Scheduling: An Essential Guide to Competitive Manufacturing delivers a masterful exploration of today's master planning and scheduling techniques, as well as an insightful discussion of the future of the master planning and scheduling processes and profession.<br/><br/>Written in the context of an ever-evolving digital environment and augmented with new and critical information required to implement best practices, the book is a guide for practitioners and leaders on the principles of master planning and scheduling and its application in modern and future work environments.<br/><br/>In this book, readers will learn:<br/><br/>Insights regarding top-down, bottom-up, and side-to-side integration of business practices in support of a company's strategic direction and tactical deployment<br/>The critical link between time-phased integrated business planning, master planning, master scheduling, capacity planning, and material planning<br/>"How-to" details and examples to support master planning and scheduling implementation and enhancements within the company's demand and supply organizations<br/>Master Planning and Scheduling is an indispensable guide for supply chain professionals, planners and schedulers in all functional domains of a business. It also belongs on the bookshelves of any executive or manager who seeks to improve their understanding of best practice planning and scheduling processes and how those processes enable a business to outperform the competition through alignment, integration and synchronization across all functions in an organization.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Manufacturing resource planning
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Production scheduling
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Deutsch, Eric
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Book
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Bill No Bill Date Home library Current library Shelving location Date acquired Source of acquisition Cost, normal purchase price Total Checkouts Full call number Accession Number Date last seen Copy number Cost, replacement price Price effective from Koha item type
    Dewey Decimal Classification     Operations Management & Quantitative Techniques TB675 10-06-2022 Indian Institute of Management LRC Indian Institute of Management LRC General Stacks 07/06/2022 Technical Bureau India Pvt. Ltd. 7887.37   658.53 PRO 002664 07/06/2022 1 11996.00 07/06/2022 Book

©2019-2020 Learning Resource Centre, Indian Institute of Management Bodhgaya

Powered by Koha