Enterprise resource planning: (Record no. 4917)

MARC details
000 -LEADER
fixed length control field 01629nam a22002177a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20230105152251.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230105b ||||| |||| 00| 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9788131787038
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.4012
Item number BAN
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Bansal, Veena
245 ## - TITLE STATEMENT
Title Enterprise resource planning:
Remainder of title a managerial perspective
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Name of publisher, distributor, etc. Pearson Education Ltd.
Place of publication, distribution, etc. Noida
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent viii, 203 p.
365 ## - TRADE PRICE
Price type code INR
Price amount 375.00
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Table of content<br/><br/>1. Introduction to Enterprise Resource Planning Systems<br/>2. Life Cycle of an ERP Implementation Project<br/>3. Benefits and Cost of an ERP System<br/>4. Change Management<br/>5. Business and IT Alignment<br/>6. Requirements Engineering<br/>7. Re-engineering<br/>8. ERP selection<br/>9. Managing an ERP Project<br/>10. ERP and Related Technologies<br/>11. Introduction to Commercial ERP Software
520 ## - SUMMARY, ETC.
Summary, etc. Enterprise Resource Planning: A Managerial Perspective focuses on the fundamentals of ERP and details methods of implementing ERP systems. By using actual case incidents, this book charts the life cycle of ERP projects from cost and profit analysis, through change-management on the basis of re-engineering and technical requirements, to the ion of the ERP system and its final application.<br/><br/>With a variety of exercises applicable to real-life scenarios, this book equips managers with the appropriate skills for utilizing ERP systems, and uninitiated readers will gain a thorough understanding of an ERP project life-cycle.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Business planning
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Management information systems
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Enterprise resource planning
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Book
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Bill No Bill Date Home library Current library Shelving location Date acquired Source of acquisition Cost, normal purchase price Total Checkouts Full call number Accession Number Date last seen Date checked out Copy number Cost, replacement price Price effective from Koha item type
    Dewey Decimal Classification     Operations Management & Quantitative Techniques TB2585 24-12-2022 Indian Institute of Management LRC Indian Institute of Management LRC General Stacks 01/05/2023 Technical Bureau India Pvt. Ltd. 262.50 2 658.4012 BAN 004162 09/25/2023 09/13/2023 1 375.00 01/05/2023 Book

©2019-2020 Learning Resource Centre, Indian Institute of Management Bodhgaya

Powered by Koha