Amazon cover image
Image from Amazon.com

Issues in supply chain scheduling and contracting

By: Material type: TextTextPublication details: Springer Dordrecht 2013Description: xxvii, 182 pISBN:
  • 9783658037680
Subject(s): DDC classification:
  • 658.404 ULL
Summary: Introduction Christian A. Ullrich investigates the optimization potential of integrated supply chain scheduling approaches. Considering a company-internal supply chain, the author´s first research question is whether the results of integrating machine scheduling and vehicle routing are significantly better than those of classic decomposition approaches which break down the overall problem and solve the subproblems successively. The scope is then broadened to include the machine and transportation scheduling problems of two and more companies at consecutive supply chain stages. The last part of this dissertation addresses supply chain contracting issues.
List(s) this item appears in: Operation & quantitative Techniques | Finance & Accounting
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Book Book Indian Institute of Management LRC General Stacks Operations Management & Quantitative Techniques 658.404 ULL (Browse shelf(Opens below)) 1 Available 002089

Introduction
Christian A. Ullrich investigates the optimization potential of integrated supply chain scheduling approaches. Considering a company-internal supply chain, the author´s first research question is whether the results of integrating machine scheduling and vehicle routing are significantly better than those of classic decomposition approaches which break down the overall problem and solve the subproblems successively. The scope is then broadened to include the machine and transportation scheduling problems of two and more companies at consecutive supply chain stages. The last part of this dissertation addresses supply chain contracting issues.

There are no comments on this title.

to post a comment.

©2019-2020 Learning Resource Centre, Indian Institute of Management Bodhgaya

Powered by Koha